Home Enquiry Contact us
 
 
 

Track Record

 
  • Welder training program Practical and theory conducted at VA TECH HYDRO, Mandideep, M.P. (2004).

  • NDT and welding consultancy to SGS India Pvt ltd for captive power plant at M/s Maral Over Seas for 10 MW unit FBC boilers 1 Nos. (2007).

  • Developed Refurbishment procedure for Boiler and High integrity piping main steam lines for five Cail Babcock Boilers Doha East Power Station Kuwait (2003).

  • NDT / Emat survey, Boroscope survey, for Benign Survey conducted for Boiler IHI / Five Cail Babcok 90 kgf 650 Tons per hour Natural circulated Boilers (2002-2003).

  • Hot and cold walk down feasibility and routine survey of Boilers during emergency outage and Routine maintenance (2003).

  • Consultancy work for the WPS preparation and qualification for Material SA 743 C6NM for Saurabh Metals, Mandideep, M.P. (2005).

  • Consultancy work for WPS/PQR qualification for SMAW/GMAW for SA 36 Material M/s Fitwell Corporation, Bhopal, M.P. (2006).

  • Successfully conducted practical training for Brazing qualification and got Approval from Power grid for M/s TESLA Transformers, Bhopal, M.P. (2006).

  • Welder training program Practical and theory and Training on Industrial safety related to welding and cutting conducted at M/s Shrao Industries, Bhopal, (2007).

  • Customer Development and product design activities for M/s Fitwell Corporation, Bhopal, M.P. (2007).

  • Presentation Development for M/s Sigma Industries for their Valued customer M/s AREVA, Vadodara, (2007).

  • Consultancy service for M/s Mech and Fab Bhopal developing work procedure , quality team for Cryogenic Nitrogen run tank Double jacketed tank length 24 Mtrs and outer dia 3.2/ 4.2 Mtrs for Bina Refinery projects (2007).

 
 
  • Design of Air / Hydraulic tanks 34 Nos for M/s GTV for Subansiri Projects 250 MW X8 Nos according ASME section 8 code calculation (2007).

  • Certification of welders and brazers as per the norms specified by EN 13133/13134 and Third Party Inspection for VA TECH Hydro Mandideep 2008

  • Vendor development and third party inspection for component for LMZ/LMW 210 MW steam turbines for M/s Power service Mumbai.

  • Vendor assessment and third party inspection for at M/s Soni Ispat indore and M/s Aravind pipes ltd Vadodara for M/s Laxmi Engineering Bhopal in 2007

  • Training for Engineers/ Inspectors total 23 Nos for M/s SGS India Pvt ltd Coimbatur Division one of the leading Third party inspection agency world wide

  • Third party inspection of Turbine/ Auxiliaries for Unit No 9 capital overhauling of Satpura thermal power station 210 MW unit year 2008 as per MPGEN contract.

  • Third party inspection FOR HRSG 5 nos and Utility Boiler 2 Nos at NCU –IOCL Panipet for L&T projects.

  • Inspection of utility Boilers 30 Tons per Hour Qty 2 nos at M/s Star paper mills Sharanpur U.P , 2008 fr client M/s Laxmi engineering

  • Inspection of Bagase fired Boiler 50 Tons per Houer 65 Kgf/cm2 at M/s Trident sugars, Bidar, A.P for M/s Laxmi engineering Bhopal - 2008

  • Preparation of Feasibility study report and DPR for 80 MW Blast furnace gas fired Thermal power station at M/s Halouen vorgiki , Athens , Greese 2008

  • Training of welders and engineers total 19 Nos at M/s TESLA Transformers -2008

  • Welder certification program at M/s Electotech Engineers Mandideep- 2008

  • Certification and training of Brazers in gas brazing for M/s Forward Engineering

 
For their BHEL projects in ASME section 9.
  • Design of CACA coolers with FU for M/s SHRAO engineering Bhopal – 2008 for BHEL contract requirement

  • Training of Engineers and Supervisors related to QC, Welding, House keeping, Safety, at M/s Satyam Industries Bhopal Year 2008

  • Training of Engineers and welders for M/s Tesla Transformers Bhopal Year 2008

  • Welder certification program at M/s SVP Plastics , Mandideep 2008 ASME IX

  • Training for middle management on welding technology,ASME codes, inspection, Painting at M/s EMCO jalgoan ( Total 23 Engineers).2008

  • Design audit and assessment study of M/s EMCO Mumbai div 2008

  • Training program at M/s Electro Auto Industries Bhopal for shop supervisors and engineers 2009

  • Shop audit preparation activities at M/s Satyam Industries for M/s Wartsila Finland 2009

  • Shop audit preparation at M/s Fitwell Corporation Bhopal for M/s VOITHS FUJI Japan 2009

  • WPS/PQR and welder qualification training and certification at M/s Shree Ganga International Mandideep Year 2009

  • WPS/ PQR/ welder training qualification for M/s United Engineers Ltd Bhopal for customer VATECH hydro Mandideep.

  • TPI and expediting service for M/s Kirloskar Pnumatic power corporation Pune at Ms/ GEI Hamon Bhopal for Cains energy .

  • TPI & Consultancy service at south India, Central India and North India for M/s Tenova Hypertherm Pvt Ltd an Italian based company who are in to steel manufacturing.

  • Painting inspection and consultancy at Mumbai for COZIPA Cuba Projects M/s Tenova Hypertherm at Mumbai

  • Third party Inspection and expedition at NI industries Hydrabad for M/s COZIPA 460 Tons /Hour Walking beam furnace

 
 
  • Third party Inspection for JSW projects Chimney For M/s Tenova Hypertherm at Bhilai / Raipur

  • Welding Inspection and consultancy for NTPC project for Crompton Greaves M7 Bhopal 2009

  • Failure analysis Study for M/s EICHER Tractors Mandideep Bhopal

  • Welding Inspections and consultancy for SIEMENS Mumbai 498 MVA HVDC Transformers

  • Boiler Inspection at M/s ADGAS Abhudabi Shut down Train3 Plant 45 2009.

  • Expediting activities of M/s Altom power India Ltd at Pune, Auragabad, Mumbai, Bhilai , Chennai and Bangalore

  • Failure analysis of Penstock welding at Malana H.P .2 x 100MW for M/s ABIR infra tech Pvt ltd 2011 /2012

  • Inspection , Audit and Consultancy service for Hydro power plant 6 X 200MW Teesta IV , Sikkim 2012

  • Inspection of Mining component for M/s METSO Minerals all over India

  • Inspection of Motors and electrical components for M/s KBL Year 2011 /2012

  • Inspection of Motor and Electrical components for Ms/ RINA Sp 2011/2012

  • Inspections Service for Boiler Plant 31 Train 2 ADGAS MHI boilers 3 &4 at Abhudabhi DAS ISLAND year 2012, for M/s EIL

  • Inspection & Support service for Shut down at M/s Thyseen Krupp for TADL Furnace for M/s Hypertherm

Year 2011/2012.

  • Shut down activities inspection support service for M/s Tenova hypertherm at M/s TATA Jamshedpur

HSM ( walking beam furnace..

  • Failure analysis and Inspection services for Teesta 3 1200 MW hydro electric project 2013-2014.

  • Turn around shut down at ADGAS Train 1 & 2 Abhudabhi for inspection of Boilers 2013

  • Inspection of components for CFB Boilers for Valmet Power at Kolkatta

  • Inspection Bearing Housing and component for Paper Mills for M/s Valmet Tech 2012/2013

  • Export Inspection of Fin tubes for M/s Eilgen South Africa at M/s Fitwel Corporation

  • Audit preparation services for clients like Geomont France.ABB finland for the certification of welders in ISO 15614-1 and audit preparation against ISO 3834 requirements 2014

  • Inspection of CCR reactors and Charge feed heater for Quad Int at Binh Son refinery Vietnam 2014

  • Inspection of Heater for CDU unit at BPCL refinery Mahul Mumbai 2014

  • Inspection of heat exchangers and Columns at QAATAR Gas Train 5 Turn arounf 2014

  • Inspection of columns vessels heat exchangers at BPCL cochin refinery for VGO / CCR units 2014

 
 
     
 

Our Clients

  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input
  • Expandable Input